ALISA

Manual windlass instalation
Moved the chain entry and fitted new s/s entry fitting. Glassed in 12mm ply underneath deck as extra renforcement.
Just need to apply deck paint.
Inside the locker. inserted new ply base glassed it all in then drilled a hole each side for the water to drain out. Measured 24 inch from teak rail down for the holes. Allthough I drilled from the inside this gives you some indication as to the hole level above the water line.